BICSI G2.1-22 PDF Download
$23.00
ICT Outside Plant Construction and Installation: Pole Setting, Anchoring, and Guying
standard by BICSI, A Telecommunications Association, 07/21/2022
Document Format: PDF
Description
BICSI G2.1-22 provides instructions and installation methods for raising, anchoring, and guying poles to support OSP cable within aerial pathway. Within this 100 page standard, details are provided that cover all but the most extreme and inhospitable locations.
Product Details
- Published:
- 07/21/2022
- Number of Pages:
- 111
- File Size:
- 1 file , 6.2 MB
- Note:
- This product is unavailable in Russia, Ukraine, Belarus